Band Occupancy
Observe frequency use across the bands and time windows that matter to the event.
- Peak and median activity
- Time-dependent behavior
- Known and unknown signals
Advance spectrum site surveys
Build a geotagged baseline of occupancy, noise floor, potential interferers, and model-calibration evidence while there is still time to adjust the operating plan.
Survey coverage
The survey plan is built around the radios, bands, site, event schedule, and the modeling questions the survey must answer.
Observe frequency use across the bands and time windows that matter to the event.
Compare representative locations, antenna heights, orientations, and platform positions.
Document signals and locations requiring coordination or deeper analysis.
Use measured link or field observations to refine propagation and site assumptions when included.
Workflow
Identify the bands, systems, planned positions, route, event time, and acceptance decisions.
Select locations, dwell times, antennas, spans, settings, and environmental observations.
Capture geotagged evidence with calibration state, losses, settings, time, and operator notes.
Compare the observations with the desktop model and deliver prioritized mitigations.
Measurement record
| Evidence field | Why it matters | Example |
|---|---|---|
| Time and location | Allows correlation with site activity, position, terrain, and event schedule. | UTC/local timestamp, latitude/longitude, height, route point |
| RF chain | Converts instrument display values into interpretable field observations. | Antenna factor/gain, polarization, cable loss, preamp/attenuator |
| Instrument state | Makes comparisons repeatable and prevents hidden measurement bias. | Calibration date, RBW, VBW, detector, dwell, reference level |
| Signal observation | Separates persistent, intermittent, and event-dependent activity. | Center frequency, occupied span, peak/median level, duty behavior |
| Environmental context | Explains geometry and local effects that the terrain database may not contain. | Buildings, foliage, vehicles, obstructions, temporary emitters |
Deliverables
Questions
Early enough to analyze results and change the plan, but close enough that the site's RF environment is representative. For complex events, 30–60 days before execution is often a useful planning target.
No. It characterizes the environment during the sampled locations and times. The report states the observation window and remaining uncertainty.
Potentially, after access, escort, equipment, security, data-handling, and photography restrictions are defined and approved by the site authority.
Raw or processed files can be included when the formats, volume, ownership, and handling requirements are defined in the proposal.
Send the location, date window, bands, radio list, planned operating points, and the decision the survey must support.