Advance spectrum site surveys

Characterize the RF environment before the event.

Build a geotagged baseline of occupancy, noise floor, potential interferers, and model-calibration evidence while there is still time to adjust the operating plan.

  • Passive survey by default
  • Recorded instrument settings
  • Decision-ready site baseline
GeotaggedLocation and timestamp tied to each relevant observation
RepeatableInstrument and antenna settings recorded for interpretation
CalibratedEquipment state and known losses documented
ActionableFindings translated into frequency, placement, and test decisions

Survey coverage

Site-survey scope

The survey plan is built around the radios, bands, site, event schedule, and the modeling questions the survey must answer.

01Baseline

Band Occupancy

Observe frequency use across the bands and time windows that matter to the event.

  • Peak and median activity
  • Time-dependent behavior
  • Known and unknown signals
02Environment

Noise-Floor Mapping

Compare representative locations, antenna heights, orientations, and platform positions.

  • Fixed and mobile points
  • Hotspot comparison
  • Candidate launch/GCS sites
03Compatibility

Potential Interferers

Document signals and locations requiring coordination or deeper analysis.

  • Co-band observations
  • Adjacent-band activity
  • Follow-up hypotheses
04Correlation

Model Calibration

Use measured link or field observations to refine propagation and site assumptions when included.

  • Measured-versus-modeled
  • Adjusted assumptions
  • Updated risk products

Workflow

Survey planning and field workflow

01

Define the questions

Identify the bands, systems, planned positions, route, event time, and acceptance decisions.

02

Build the collection plan

Select locations, dwell times, antennas, spans, settings, and environmental observations.

03

Collect and document

Capture geotagged evidence with calibration state, losses, settings, time, and operator notes.

04

Analyze and update

Compare the observations with the desktop model and deliver prioritized mitigations.

Measurement record

Measurement records and traceability

Evidence fieldWhy it mattersExample
Time and locationAllows correlation with site activity, position, terrain, and event schedule.UTC/local timestamp, latitude/longitude, height, route point
RF chainConverts instrument display values into interpretable field observations.Antenna factor/gain, polarization, cable loss, preamp/attenuator
Instrument stateMakes comparisons repeatable and prevents hidden measurement bias.Calibration date, RBW, VBW, detector, dwell, reference level
Signal observationSeparates persistent, intermittent, and event-dependent activity.Center frequency, occupied span, peak/median level, duty behavior
Environmental contextExplains geometry and local effects that the terrain database may not contain.Buildings, foliage, vehicles, obstructions, temporary emitters

Deliverables

Survey deliverables

Survey plan and collection matrixLocations, bands, settings, timing, responsibilities, and decision criteria.
Geotagged observation setOrganized data, screenshots or traces, logs, and field notes as scoped.
Occupancy and noise summaryObserved activity, quiet windows, persistent signals, and site-to-site comparisons.
Potential interference registerSignals or locations requiring coordination, avoidance, or deeper investigation.
Measured-model comparisonUpdated assumptions and calibration findings when link measurements are included.
Survey findings briefRecommended channels, positions, timing, mitigations, and remaining uncertainty.

Questions

Survey planning and access requirements

How far ahead should the survey occur?

Early enough to analyze results and change the plan, but close enough that the site's RF environment is representative. For complex events, 30–60 days before execution is often a useful planning target.

Does a passive survey reveal every future interferer?

No. It characterizes the environment during the sampled locations and times. The report states the observation window and remaining uncertainty.

Can you survey restricted ranges or facilities?

Potentially, after access, escort, equipment, security, data-handling, and photography restrictions are defined and approved by the site authority.

Do you provide raw data?

Raw or processed files can be included when the formats, volume, ownership, and handling requirements are defined in the proposal.

Schedule the survey before the operating plan is fixed

Send the location, date window, bands, radio list, planned operating points, and the decision the survey must support.

Scope an advance survey →